Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_csqbuk/sirqconstruction.ripedevsites.com/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_csqbuk/sirqconstruction.ripedevsites.com/wp-includes/functions.php on line 6131
SIRQ Construction Melisa Nellesen Center for Autism - SIRQ Construction

Education

Melisa Nellesen Center for Autism

Client:

Melisa Nellesen Center for Autism

Square Feet:

15,000 sq.ft.

Project Type:

Education

Melisa Nellesen Center for Autism

Welcome to the Cole Nellesen Building, a 15,000-square-foot sanctuary nestled on the University’s Orem Campus. Designed with precision and compassion, this facility is a testament to our commitment at SIRQ Construction to create a nurturing space for teaching, observing, and learning to teach children with Autism. Join us on a journey through this remarkable project.

Conclusion

Cole Nellesen Building: Shaping Futures, Fostering Inclusion

The Cole Nellesen Building is more than just a structure; it’s a space that shapes futures and fosters inclusion. With UVU classrooms, therapy rooms, sensory spaces, and innovative features, it represents our unwavering dedication at SIRQ Construction to empower education and support those on the autism spectrum.